Archive for March, 2012

Camper Cabin Update

Posted on: March 27th, 2012 by Silver Lake Mennonite Camp

The metal roof is on, interior walls are framed, insulation is in (not yet complete) and the windows and doors are installed! The cabins are really taking shape!

New camper cabins are taking shape!

Posted on: March 10th, 2012 by Silver Lake Mennonite Camp

Leanne and I were at camp yesterday to meet with the contractor responsible for building the two new camper cabins. They look great! Walls are framed and wrapped. Next steps include building the porch structure and installing the windows and doors.